搜索历史清除全部记录
最多显示8条历史搜索记录噢~
All
  • All
  • Product Management
  • News and Information
  • Introduction Content
  • Corporate outlets
  • Frequently Asked Questions
  • Corporate Video
  • Corporate Portfolio

Guangdong Provincial Museum

Guangdong Provincial Museum

Seven-Fluoropropane Pipeline Network Maintenance and Refilling Plan

This solution is tailored for the in‑building piped‑network halon‑free fire suppression system and is developed in accordance with GB 50370 and NFPA 2001 standards, providing end‑to‑end maintenance and refilling services. Key procedures include pressure vessel leak testing, agent residual‑quantity analysis, and pipeline air‑tightness verification. The system is refilled with UL‑certified halon‑free extinguishing agent from Sinochem Lantian, ensuring that the extinguishing concentration meets the 9% design requirement. Concurrently, smoke detector–alarm control panel interlock functionality is tested to guarantee proper system operation. This approach delivers zero‑contamination maintenance for fire suppression systems in cultural relic storage facilities and exhibition halls, fully complying with fire safety regulations for cultural heritage protection units.

Next page

Return to the previous page